US_41_Corridor_10th_to_14th

FDOT D1 Planning Growth Management - US 41 Design Traffic

KAI developed the Project Traffic Report in support of the US 41 PD&E Study (from 10th to 14th Streets) in Sarasota, Florida. Prepared for FDOT District 1, the project focused on multimodal improvements along an urban arterial to include roundabouts at two intersections.

The Project Traffic Report includes development of future volume conditions, analysis of roundabout and traditional improvement alternatives, evaluation of off-peak conditions for the nearby performing arts center, and multimodal analysis using the procedures from the Highway Capacity Manual 2010.