Redmond Downtown Signal Updates

The City of Redmond, utilizing a $780,000 federal Transportation, Community and System Preservation Program (TCSP) grant, retained KAI to complete the design engineering plans for 1) a new traffic signal at the SW Black Butte Boulevard/SW 5th Street intersection. and 2) the replacement of the existing traffic signals at the SW Black Butte Boulevard/SW 6th Street, SW Evergreen Avenue/SW 6th Street, and SW Evergreen Avenue /SW 5th Street intersections.

KAI is currently preparing the PS&E package including traffic signals, permanent and temporary signing, and permanent pavement markings.