SR 503 at Scotton Way Improvements

As part of the OTAK project team, KAI provided traffic engineering and design services to the improvement of the SR 503/Scotton Way intersection in Battle Ground, Washington. This project, being led jointly by the City of Battle Ground and Washington Department of Transportation, involved extending Scotton Way west from SR 503 to SW 20th Avenue, and installing a new traffic signal at the SR 503/Scotton Way intersection. Additional improvements included adding turn lanes on both SR 503 and Scotton Way, and providing street lighting along the length of Scotton Way and at the SR 503 intersection.

KAI prepared traffic studies of existing and future conditions, performed a signal warrant analysis, developed conceptual improvement layouts, and developed traffic design plans for the traffic signal, signing, striping, illumination, and interconnect.