Challenge
The City of Harrisonburg, Virginia, sought to study Mt Clinton Pike, a four-lane corridor primarily serving vehicular traffic. Mt Clinton Pike’s existing lane configuration often led to higher speeds and lacked safe and accessible facilities for all other modes of travel. To improve safety, the City was looking to reallocate existing pavement and strengthen multimodal mobility and connectivity.
Solution
Kittelson led a Virginia Department of Transportation-funded road reconfiguration study on Mt Clinton Pike and completed a roundabout operations analysis at the intersection of Mt Clinton Pike and Acorn Drive. Our team analyzed the corridor’s existing and future traffic operations as well as its crash history. The team identified crash types that could potentially be mitigated by reconfiguring the road to have dedicated left-turn lanes at intersections.
The team then modeled alternative configurations in Synchro to test operational performance, eventually developing them into straightforward design plans for implementation. The team also prepared a preliminary cost estimate. Kittelson recommended restriping the four-lane roadway into a three-lane cross section with 4-foot bike lanes in each direction and a 1.5-foot buffer. Gateways and enhanced pedestrian facilities at intersections were included to achieve consistency with the City’s vision for downtown.
As an extension of this project, and at the request of the City, Kittelson also analyzed a single-lane roundabout configuration in VJuST and SIDRA at the intersection of Mt Clinton Pike and Acorn Drive. The team found that a roundabout would provide both operational and safety benefits compared to other configurations, and the site has available space for implementation. Kittelson developed a preliminary concept of the roundabout, including transitions from the on-street buffered bike lanes to a shared-use path at the intersection.
The Outcome
A New Road Configuration Opens Up More Ways to Travel
The recommended improvements provide multimodal accessibility and address vehicular and non-motorized conflicts at intersections without causing extra congestion. For Round 6 of SMART SCALE, the City of Harrisonburg submitted an application containing the Mt Clinton Pike/Acorn Drive roundabout and other corridor safety improvements along Mt Clinton Pike. The project has since been scored and funded.