Challenge

Reserve Street is one of Missoula, Montana’s busiest corridors and serves as a major route for commuters, businesses, and regional traffic. The 5.5-mile corridor experiences recurring congestion, delays, and long queues, particularly during peak travel periods. The Montana Department of Transportation (MDT) wanted to improve traffic operations by better matching signal timing to changing traffic patterns throughout the day and week. The challenge was to make the most of the existing roadway and signal system while identifying operational constraints that signal timing alone could not resolve.

Solution

Kittelson evaluated and retimed 14 traffic signals, including 12 along Reserve Street and at two adjacent City intersections. Using MDT’s Automated Traffic Signal Performance Measure (ATSPM) system, travel–time data, traffic analysis, and field observations, our team developed new signal timing strategies tailored to the corridor’s changing traffic patterns and operational needs.

Rather than simply adjusting signal coordination, we developed different timing strategies for different conditions, including new weekday and weekend schedules and more flexible signal operations at constrained intersections. We also updated pedestrian and bicycle timing and spent extensive time in the field monitoring traffic, evaluating performance, and fine-tuning the plans based on observed conditions and ATSPM data.

Our evaluation went beyond signal timing to identify where roadway geometry, turn-lane storage, access conflicts, and traffic demand were limiting operations. These findings helped distinguish improvements achievable through signal timing from those requiring future infrastructure investments, which provided MDT and the City with recommendations for longer-term corridor improvements.

The Outcome

Smarter Signal Timing Is Everything in Missoula, Montana

The updated signal timing plans reduced average travel times by approximately 10% in both directions, saving drivers about one minute traveling through the corridor. During the weekday p.m. peak, travel times improved by 19% southbound and 16% northbound.

By reducing travel times, the project improved how the existing transportation system serves vehicles, pedestrians, and bicyclists while providing MDT and the City with a clearer understanding of the corridor’s remaining challenges. The result is better traffic operations today and valuable guidance for prioritizing future improvements along one of Missoula’s busiest corridors.